EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
CH750-SR
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (227)
Research
- (11)
Workshop
- (8)
Empennage
- (69)
Fuselage
- (20)
Firewall
Tail Feathers
- (8)
Wings
- (46)
Controls
Avionics
Lighting
- (1)
Instrument Panel
- (1)
Landing Gear
- (2)
Engine
- (58)
-
Engine on Test Stand
-
Top End / Accessory...
-
Final engine...
-
Harmonic Balancer...
-
Harmonic Balancer...
-
Finish Cylinder...
-
Parts
-
Piston / Cylinder #1...
-
Piston / Cylinder #1...
-
Piston / Cylinder #1...
-
Piston / Cylinder...
-
Piston / Cylinder...
-
Piston / Cylinder...
-
Piston / Cylinder...
-
Cylinders
-
Painting Cylinders...
-
Cylinders
-
Cylinder cleaning
-
Elevator
-
Parts Inventory
-
Parts from Green...
-
Cylinder Assembly...
-
Assembly Research
-
Corvair 3.0L...
-
Corvair 110HP head...
-
ACF-50 Crankshaft
-
110 HP Head Search
-
Short Block
-
Short Block
-
Short Block
-
Case Inspection
-
Engine Cleaning
-
Engine Cleaning
-
Engine Shipping
-
Engine Cleanup
-
Engine Parts
-
Engine Cleaning
-
Engine Cleaning
-
Engine Cleaning
-
Engine Cleaning
-
Engine Cleaning
-
Engine Cleaning
-
Engine Case Cleaning
-
Case / Cam
-
Engine cleaning
-
Engine crankshaft
-
Engine Case and...
-
Case and Crankshaft...
-
Case cleaning
-
Detail cleaning
-
Case Cleaning /...
-
Engine Cleaning
-
Engine Core Teardown
-
Engine Core Teardown
-
Engine Core Teardown
-
Engine Core Teardown
-
Engine Core Teardown
-
Engine Core Teardown
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (3)
Builder Name:
Skip Rhudy
-
Project:
Zenair - CH 750
-
VIEW REPORTS
Total Hours:
551
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Sep 17, 2019 - No Finish Date
Engine:
Corvair
Propeller:
Sensenich W642KL-35GS
Friendly URL:
https://eaabuilderslog.org?s=CH750-SR
Home or Last Project Picture
Feb 22, 2020
Short Block
- (12 hours)
Category: Engine
Installed oil gallery plugs. Put TZero in engine build stand. Put in crankshaft, camshaft, and aligned them. Lubed the cam lobes. Closed the case and torqued correctly. Put on 5th bearing case. Drilled and pinned 5th bearing. Put on gasket material and torqued 5th bearing housing correctly. Put on 5th bearing oil seal. Installed safety shaft and prop studs.
wwh_5thbearinganaerobicgasket01.jpg
wwh_5thbearingsealbox00.jpg
wwh_camlobeslubricated00.jpg
wwh_casebolttighteningpattern00.jpg
wwh_safetyshaftinstallcollett.jpg
wwh_safetyshaftinstallcranklock.jpg
wwh_tzeroleftcaseinstand.jpg
wwh_tzerooilgalleryplug00.jpg
wwh_hanger.jpg
wwh_wiliamdansheridancarbtestrun00.jpg
wwh_camcrankalignedcorrect00.jpg
wwh_camlobeslubricated01.jpg
wwh_crankshaftincase.jpg
wwh_mainbearing10undersize00.jpg
wwh_paintstartergear01.jpg
wwh_safetyshaftinstallcollett.jpg
wwh_tzerocamshafttestfit.jpg
wwh_tzeroshortblockbefor5th01.jpg
wwh_tzeroshortblockbefore5th00.jpg
wwh_tzeroshortblockcomplete.jpg
wwh_tzeroshortblockcomplete.jpg
wwh_spa5thidmarkings01.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.